Here are the latest photos of Ginette’s renovation project.

 

The team have finished the rear extension elevations; Ginette has ordered the windows which should be delivered within two months. The next phase involves building the zinc roof on the rear.

 

Eleu0301vation 1er eu0301tage 2

Dalle 1er eu0301tage

The basement is being lowered by 60cm. The foundation walls are old and not really adequate enough, so the team will increase the width of the foundations all around the house.

Reprise fondations 1

On the inside,  the team are demolishing the interior walls and Ginette has already taken delivery of  the wall and floor tiles for the three bathrooms. The tiles in each bathroom will be light grey, dark grey and white. I love the tiles, they remind me of Deborah Bowness Tiles D wallpaper.

Carreau-ciment du Marais